In the previous article, we introduced the working principle and technical parameters of solar insecticidal lamps. In order to make everyone better use, we have provided detailed steps for the installation and use of solar insecticidal lamps. I hope to help you!
The first step: foundation pouring 1. Determine the position of the vertical lamp to investigate the geological conditions. If the soil is soft and soily, then the bottom of the foundation should be compacted. At the same time, it is confirmed that there is no other facilities in the underground. There is no long-term sunshade on the top of the insecticidal lamp (including the woods). Occlusion) Otherwise replace the lamp position.
2. Digging the pit, excavating the standard soil pit according to the size of the embedded part in the position of the standing lamp, and positioning and pouring the embedded part according to the construction drawing. Pay attention to keep the foundation on the same level as the original ground, and at the same time, the top of the screw of the embedded part shows that the cement base does not exceed the thickness of the two fixing nuts.
3. After the cleaning is completed, the residual sludge on the positioning plate (cement plane) should be removed immediately, and the impurities on the bolts should be cleaned with waste oil.
4. The solidification process of cement solidified cement is generally 72 hours, and the winter is properly extended. After the solidification of the susceptor is completed, the solar lamp can be installed.
Step 2: Installation of solar modules 1. Output of the panel components Before and after connecting to the solar controller, measures should be taken to avoid shorting.
2. The connection between the solar cell module and the fixed bracket should be firm and reliable.
3, the output line of the component should be avoided as much as possible, and tied with a tie.
4. In most parts of China, the angle between the panel of the panel and the ground is generally chosen to be 30°, and the panel is slightly westward toward the south.
The third step: battery installation 1. When the battery is placed in the battery slot, it should be handled gently. If the battery slot is not suitable, it should be treated to ensure that the battery is easy in the slot.
2. The battery output line is not allowed to be shorted under any circumstances.
3, the battery should be 5cm below the battery slot, it is strictly prohibited to be higher than the battery slot.
The fourth step: installation of the lamp 1. Fix the solar panels of each component on the solar bracket, fix the lamp head on the pick arm, and then adjust the angle and direction of the solar panel bracket to the main pole of the lamp, according to the on-site construction technician. The guiding step is to suspend the insecticidal lamp ring on the cross arm and fix the lower part of the insecticidal lamp, and each connecting line is led to the solar insecticidal lamp control box. Note that each lead is not short-circuited during lead threading.
2. The installation of the solar controller is fixed on the main pole according to the construction diagram. The wiring diagram of the controller is as follows:
3, the use and adjustment of the solar controller (1) charging indicator green is always charging for charging, green flashing for the system over voltage, check whether the battery is connected (2) battery status indicator is steady green: battery voltage is normal Range, after full, it is green and slow flashing, orange: battery undervoltage red: over-discharge voltage, controller automatically turns off output (3) The load indicator is always on, indicating that the load is turned on, flashing indicates that the output has a short circuit, and slow flashing indicates the load Overload, should reduce the load (4) Timing setting method Time setting on the back of the solar controller, time setting, up toggle switch corresponding time 1 [10H] 2 [8H] 3 [5H] 4 [4H]
4. Adjust the solar controller to check if the solar insecticidal lamp is normal. (1) Observe whether the indicators are correct. (2) Is the debugging system working properly?
Step 5: Debugging 1. Commissioning of light control function Release one of the solar panel connection lines on the solar controller. Each light source should work normally. There is voltage on the high voltage net of the insecticidal lamp; connect the solar cell on the solar controller. The board connection line, the light sources are extinguished, the insecticidal lamp mesh has no high voltage 2, and the rain control function adjusts one of the solar panel connection lines. After the system is running normally, the rain control component is tested with a damp cloth or dripping water, and the system should stop working. After taking the wet cloth or wiping the water droplets, the system should work normally, indicating that the system rain control is normal.
3. The time control function debugging can be set and tested according to the timing requirements.
Installation precautions <br> The red line is positive, the other line is negative, the terminal and the positive and negative terminals can not be shorted, that is, the positive and negative poles cannot be connected to one. 2. The positive and negative terminals of the terminal can not be connected. 3. The terminal can not be grounded.
Plant extracts refer to substances extracted or processed from plants (all or a part of plants) using appropriate solvents or methods, and can be used in the pharmaceutical industry, food industry, daily chemical industry and other industries.
There is a conceptual overlap between plant extracts and herbal extracts. The raw materials of plant extracts in my country are mainly derived from Chinese herbal medicines, so domestic plant extracts can also be called Chinese medicine extracts to some extent.
Herbal Extract,Liquid Herbal Extracts,Herbal Extract Powder,Natural Herbal Extract
XI AN RHINE BIOLOGICAL TECHNOLOGY CO.,LTD , https://www.rhinebioteches.com